During a Nine Day Shutdown at Georgia Power, Industrial Valve Replaced Twenty Five Pressure Seals in Record Time with No Round-The-Clock Manpower.
In April of 2013, Industrial Valve reduced installation time from fourteen to six hours on pressure seals ranging from 900 to 4,500 pounds using the VSG Pro, a high-density graphite bonnet seal from EGC Enterprises.